Skip to main content
Tenselo Tenselo Water Engineering Tools

Tenselo · Water engineering resources

Water engineering guides and worked examples

Work through irrigation design and water-treatment decisions with metric examples, practical input checklists and source references.

Practical reference pages for irrigation designers, pump and irrigation retailers, and water professionals. Each worked example shows its units, assumptions and the checks still required.

Guides & worked examples

Choose a calculation to work through

Follow the inputs, equations and assumptions before working on a project design.

Water treatment

Interpret the test, select the process, size the stage

These guides separate water-quality interpretation from process and equipment sizing.

Hardness

Size a water softener

Compare domestic and industrial resin, vessel, salt and regeneration calculations.

Worked examples across water engineering

Choose the question you need to answer. Each example states its inputs and shows where a project-specific design check is still needed.

Find a worked example by task
TaskWhat the example explains
Irrigation depth and run timeNet depth, gross volume and operating hours.
Dam volume and water storageTop, middle and bottom areas in a 6 ML dam.
Dosing-pump flowWater flow and active dose to stock-solution delivery.
Pump energy and paybackAnnual operating costs and a complete simple-payback case.
Wastewater load and storageBOD mass loading and available emergency storage time.
Pool volume and turnoverWater volume and an assumed circulation period.
Ventilation airflowRoom volume, air changes and the limits of that calculation.
Flow and pressure unitsMetric conversions, head and gallon definitions.
Solar-pumping water reserveDaily demand and usable reserve storage.
Feed conversion ratioFeed and biomass gain on a consistent stock basis.

Downloadable worksheet

Prepare a centre-pivot design brief

Collect the site, water demand, machine, sprinkler and supply-main inputs in a two-page fillable PDF. Record missing evidence and the person who will check it.

Download the centre-pivot design brief (PDF, 2 pages) · Compare operating hours and flow · Read the supply-main report

How to use these guides

Read the assumptions before using an equation. Follow the links between crop demand, pipe losses and pump duty to see how one decision affects the next. The numerical cases are static educational examples; they do not run the subscription calculators.

Methods, limitations and corrections · Explore all calculator categories

Put the method to work with Tenselo

Apply for a 14-day free trial. We review each application before granting access. No payment card is required for the trial.

Start 14-day free trial Browse the calculator categories

Tenselo, once a month

New features, practical water-industry articles and customer stories. One useful email each month, whether you use Tenselo yet or not.