Skip to main content
Tenselo Tenselo Water Engineering Tools
Lifecycle Cost & Energy

Pump energy cost and lifecycle calculators

Energy use, lifecycle cost, efficiency and payback that stand up in a board paper. Built for consultants and asset owners.

Watch

Commercial & lifecycle in Tenselo

A short introduction to what Tenselo covers in this category.

Video summary: Operating cost, pumping energy, equipment alternatives, payback and carbon impacts considered alongside the hydraulic duty.

Watch and share on YouTubeView all Tenselo videos

Method & worked example

Compare pump running cost at the same duty

Use electrical input power at the operating point. A motor nameplate rating alone does not tell you the power drawn throughout a year.

Illustrative comparison: same delivered flow, head and annual service
Assumption or resultExisting optionProposed option
Average electrical input while running15 kW12 kW
Operating hours4,000 h/year4,000 h/year
Energy: power × hours60,000 kWh/year48,000 kWh/year
Electricity rate, assumed constantA$0.30/kWhA$0.30/kWh
Annual energy costA$18,000A$14,400

A$3,600 annual energy saving. With an assumed incremental installed cost of A$9,000, simple payback is 9,000 / 3,600 = 2.5 years.

Simple payback is only one comparison

This example excludes maintenance, financing, tax, demand charges, discounting and changes in energy prices. For lifecycle cost, compare capital, operating, replacement and residual costs over the same period using a consistent discount-rate basis. Carbon savings need a stated emissions factor and reporting period; they cannot be inferred from power alone.

Check the complete pump curve and system duty before assuming an efficiency or variable-speed-drive saving. If operating conditions vary, calculate energy for each duty and its hours, then add them.

Use COM-004 lifecycle cost comparison, COM-005 payback and COM-006 pumping emissions. Establish the hydraulic requirement with the pump duty example.

Further reading: Australian Government guidance on motors and variable speed drives.

Static educational example · Updated 1 October 2026 · Methods and limitations. Project calculations run in the subscription application; New accounts require approval.

Why it matters on the job

Running cost up front

Annual energy and cost so the cheap pump that costs more to run gets caught.

Payback you can defend

Compare an upgrade using stated capital costs, operating duties and energy assumptions.

Lifecycle, not sticker

Capital + energy + maintenance over the asset life — the number that matters.

What is in this category

8 Commercial, Energy & Lifecycle calculators

Every calculator in this category, by its reference code. Running them requires an approved Tenselo account with access to the relevant calculators.

  • COM-001 Pipe Installation Cost Estimate

    Installed pipeline cost from pipe, trenching, fittings and testing

  • COM-002 Pump Station Cost Estimate

    Supply + install budget cost and $ per L/s of capacity

  • COM-003 Water Treatment Skid Cost Build-Up

    Budget cost for a treatment skid and $ per m3/hr treated

  • COM-004 Lifecycle Cost Comparison

    Net present cost of 2-3 options (capital + energy + chemical + maintenance + replacement)

  • COM-005 Payback Calculator

    Simple and discounted payback, ROI and net saving for an upgrade

  • COM-006 Carbon / Emissions from Pumping

    Greenhouse emissions, per ML and carbon cost for pumping

  • COM-007 Critical Spare Parts Quantity

    Recommended spares from failure rate, lead time and consequence

  • COM-008 Service Interval Planner

    Next service date, annual service count and consumable cost

Access by approval

Start your 14-day free trial

Tell us about yourself and the work you do. We review each application before granting access. The 14-day trial requires no payment card.

After approval, verify your email and set your password. Your account shows the time left in your trial. When it ends, choose a paid plan and review the price in Stripe before subscribing.

Start 14-day free trial

Already approved? Sign in. For company licences, email sales@tenselo.com.au.

Tenselo, once a month

New features, practical water-industry articles and customer stories. One useful email each month, whether you use Tenselo yet or not.