Method & worked example
How much water does a rectangular farm dam hold?
For a dam with straight, uniform side slopes, calculate the top, middle and bottom areas. Multiplying surface area by maximum depth overstates storage.
| Measurement | Calculation | Result |
|---|---|---|
| Top water surface | 60 m × 40 m | 2,400 m² |
| Bottom dimensions | 60 − 2 × 3 × 5; 40 − 2 × 3 × 5 | 30 m × 10 m |
| Bottom area | 30 m × 10 m | 300 m² |
| Area at half depth | 45 m × 25 m | 1,125 m² |
| Volume: prismoidal formula | 5 / 6 × (2,400 + 4 × 1,125 + 300) | 6,000 m³ = 6 ML |
Which dimensions should you measure?
Use the dimensions at the water level being assessed, the actual water depth and the internal side slopes. This idealised example assumes a level rectangular bottom and uniform slopes on all four sides. Irregular dams need a surveyed stage–storage relationship; do not treat their bounding rectangle as the water volume.
Stored volume is not all usable water
Deduct inaccessible water below the outlet or pump intake. Allow separately for evaporation, seepage, reserve storage and the operating water level. Freeboard above that level is not working storage.
Start with TNK-004 dam volume, then check evaporation, spillway capacity and tank overflow. For demand, use the irrigation volume example.
Field reference: Agriculture Victoria: measuring water in a dam.
Static educational example · Updated 1 October 2026 · Methods and limitations. Project calculations run in the subscription application; New accounts require approval.
Remaining water, not just full capacity
How much water is left in a partly filled dam?
Use the same dam as the example above: a level 30 m × 10 m floor, uniform 3 horizontal to 1 vertical side slopes, and a full water depth of 5 m. The table shows total stored water before deductions for inaccessible water, reserve or future losses.
| Water depth above the floor | Stored volume | Stored megalitres |
|---|---|---|
| 1 m | 432 m³ | 0.432 ML |
| 2 m | 1,176 m³ | 1.176 ML |
| 2.5 m | 1,687.5 m³ | 1.6875 ML |
| 3 m | 2,304 m³ | 2.304 ML |
| 4 m | 3,888 m³ | 3.888 ML |
| 5 m | 6,000 m³ | 6 ML |
At water depth h metres, the water surface is (30 + 6h) m long and (10 + 6h) m wide. Apply the same prismoidal formula using the bottom, half-depth and current water-surface areas. These values assume the stated geometry; they are not a lookup table for dams with different dimensions, sediment deposits or irregular banks.
Is a dam half full when the water is at half depth?
Not usually. With sloping sides, the surface area shrinks as the level falls. In this example, 2.5 m of water holds 1.6875 ML, about 28% of the 6 ML full volume. Use the dimensions at the current water level or a surveyed depth-to-storage table, rather than multiplying full capacity by the fraction of depth.
How do I convert dam volume from cubic metres to litres or megalitres?
One cubic metre (m³) equals 1,000 litres. One megalitre (ML) equals 1,000 m³ or 1,000,000 litres. Multiply m³ by 1,000 for litres, or divide m³ by 1,000 for ML. For example, 1,687.5 m³ is 1,687,500 litres or 1.6875 ML.
From stored water to a water budget
Use the volume at the current depth, deduct water that cannot be accessed and any reserve, then account for expected inflow, demand, evaporation and seepage over the same period. If the dam shape is uncertain, obtain a survey and a storage curve before relying on it for a critical supply.
Field guidance: DPIRD: measuring current dam volume and water losses. Its field-estimation methods provide context; the table above is calculated from the explicitly defined geometry.
Static educational example · Updated 9 October 2026 · Methods and limitations. Run project calculations with an approved Tenselo account.
Why it matters on the job
Volume from real geometry
Batters, floor and depth resolved to an actual stored volume — not a rectangle guess.
Drawdown you can plan
Turnover and drawdown so the storage carries the demand between fills.
Check freeboard and overflow
Assess freeboard and spillway capacity against the design inflow and operating water level.
11 Tanks, Dams & Storage calculators
Every calculator in this category, by its reference code. Running them requires an approved Tenselo account with access to the relevant calculators.
-
TNK-001 Cathodic Protection Anode Sizing
Sacrificial-anode current demand, total mass and number for a steel structure (AS 2832 / DNV / NACE)
-
TNK-002 Dam / Open-Water Evaporation Loss
Evaporation volume from a dam or open tank using pan evaporation
-
TNK-003 Dam Spillway Capacity
Overflow weir capacity / crest length to pass the design flood (Q = C.L.H^1.5)
-
TNK-004 Dam Storage Volume
Farm dam capacity from dimensions, batter slope & depth -> m3 / ML
-
TNK-005 Spill Bund / Containment Volume
Bund capacity & floor area for liquid storage (AS 1940 / EPA): 120% largest, 133% flammable, or 25% aggregate
-
TNK-006 Storage Tank Vent Sizing (API 2000)
Normal in/out-breathing vent flow from pump-in/out displacement + thermal, and the vent free area
-
TNK-007 Surge / Air-Vessel Sizing (screening)
Preliminary air-vessel volume to absorb pump-trip surge on a rising main (energy method - confirm with a transient analysis)
-
TNK-008 Tank Agitator / Mixer Power
Impeller power draw, Reynolds number, tip speed and tank turnovers
-
TNK-009 Tank Foundation Bearing
Full-tank ground pressure vs allowable soil bearing (circular flat-bottom tank)
-
TNK-010 Tank Overflow Sizing
Overflow pipe (or weir) to pass the maximum inflow without flooding the tank
-
TNK-011 Tank Shell Wall Thickness
Hoop-stress shell thickness for a vertical storage tank (API 650 1-foot method / AS 1692)
Start your 14-day free trial
Tell us about yourself and the work you do. We review each application before granting access. The 14-day trial requires no payment card.
After approval, verify your email and set your password. Your account shows the time left in your trial. When it ends, choose a paid plan and review the price in Stripe before subscribing.
Start 14-day free trialAlready approved? Sign in. For company licences, email sales@tenselo.com.au.